Jump to content

Production Manager Automation Requirements

From Idle Lumber Empire Wiki
Revision as of 05:13, 26 November 2026 by Player 0001 (talk | contribs) (Remove duplicate top-level heading; preserve actual MediaWiki page title and all article content)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Production Managers oversee portions of the permanent sawmill's manufacturing and logistics flow. Their card levels can determine automation for machines, forklifts, log trucks and related activities, but an automation level is not the same thing as a machine's Income Level or production-speed upgrade.[1]

Why a formerly automated function can stop

AppQuantum describes higher automation level requirements after a permanent sawmill promotion, even though the manager card itself is retained.[2] Rebuilding the factory may therefore require temporarily handling some logistics manually.

What to inspect before upgrading the sawmill

  • Which Production Manager controls each critical machine or vehicle?
  • Is their current card level above the visible automation prerequisite in the next factory?
  • Are sufficient duplicate cards available for a needed upgrade?
  • Has the factory shown an additional manual auto-activation control?
  • Are storage, material availability and delivery destinations functioning normally?

Automation versus capacity

A functioning automated forklift cannot move logs to a nonexistent destination or fill a warehouse beyond its limit. If a transport vehicle is standing still, check product demand, destination space and machine work cycles before declaring the manager broken.

Why a fixed universal threshold chart would be unsafe

The project has historical screenshots from different versions and sawmill tiers, but no verified 2026 table for every machine and manager combination. We do not fabricate a per-tier automation grid or assume all three production lines have identical requirements. The current in-game prompt is the most directly relevant check.

Event separation

Temporary-event managers commonly reset and may use separate levels and automation gates. A permanent Production Manager cap of level 25 does not prove the same cap applies in Green Island or a special event.[3]

Controlled test record

A useful report includes sawmill name, manager name, current level, machine/vehicle, displayed required level, whether automation is enabled, platform and build date. A before/after upgrade screenshot can establish whether a specific threshold changed.

Sources

  1. ↑ AppQuantum, Manager Types, publisher guidance reviewed November 2026.
  2. ↑ AppQuantum, Forklifts Stop Automating After Upgrade, publisher FAQ.
  3. ↑ AppQuantum, Temporary Event Guide, publisher reference.