Glass and Product Materials
Glass and differentiated product materials became part of the redesigned permanent-sawmill experience described in the publisher's 2026 release history. The updated production system includes separate lines and specialized storage, so simply increasing log throughput is no longer sufficient to explain every product backlog.[1][2]
What changed
Old guides treated most production as successive wood-processing machines delivering a uniform product. Newer permanent factories show more material types and line-specific outputs. A contract may specify the particular product it needs; a large stockpile of another product does not necessarily satisfy that request.
Finding the missing material
Open the targeted order's requested item and compare it with the inventory section and factory line responsible for that product. If the line is disabled, its manager is underleveled, a machine is missing or the warehouse segment is full, that may explain why the order does not advance.
Glass and Felix
The 2026 overhaul includes publisher and player references to glass and a manager named Felix. Exact Felix availability, level requirement, glass production throughput and store-unlock rules need build-specific verification; reported rollout timing conflicts among players who saw the feature at different dates. This page will not invent a universal trigger or count from those anecdotes. Related unresolved research is recorded in the wiki's private verification tracker.
Historical screenshots
A screenshot from 2025 may show a production chain without glass or parallel sections. It remains useful historical evidence but cannot prove that the same structure exists on a 2026 account. Label any machine or reward image with the version and platform whenever available.
Events are different
Do not transfer glass production, Felix or line-specific warehouse assumptions from the permanent sawmill into Green Island or Roaring '20s unless the event itself shows them in the tested build.[3]
Measuring the production chain
Record input stock, specific material/output, machine manager level, throughput, warehouse capacity and order requirement before changing any factor. The most expensive upgrade is not always the bottleneck. See Parallel Orders and Warehouse Storage and Bottlenecks.
Sources and further reading
- ↑ Apple App Store, Lumber Inc. iOS version history (2026 update notes; checked November 2026).
- ↑ AppQuantum, Machines and Materials.
- ↑ AppQuantum, Temporary Events Guide (event progress is separate).
Report a correction on this page · Questions? Email the wiki editor.