Jump to content

Event Lumberjack Stalling Investigations: Difference between revisions

From Idle Lumber Empire Wiki
Add source-dated official November 2026 game bug states and safe mode-specific checks
Owner-observed event stall, 2026 dated chest pool anecdotes, and mode-specific manager/stage multipliers; source-verified, no universal triggers
 
Line 3: Line 3:
== A documented player observation ==
== A documented player observation ==
During a reported Green Island event session, workers initially appeared stalled while log collection was still occurring. A player reported that upgrading '''Canting Machine 1 from level 2 to level 3''' coincided with workers resuming normal activity. That is a '''firsthand, single-session observation''', not proof that this particular machine upgrade is always required.
During a reported Green Island event session, workers initially appeared stalled while log collection was still occurring. A player reported that upgrading '''Canting Machine 1 from level 2 to level 3''' coincided with workers resuming normal activity. That is a '''firsthand, single-session observation''', not proof that this particular machine upgrade is always required.
== Three situations that look alike but may have different causes ==
{| class="wikitable"
! What the player actually sees !! Evidence that fits !! Evidence that does not follow
|-
| '''Lumberjacks stop chopping and a log pile is full''' || A 17 April 2026 community event discussion reports that disabling Larry's raw-log truck can allow the local forest buffer to fill, after which cutting stops; one respondent reported a threshold of 25 logs.<ref name="event-log-backlog-community">[https://www.reddit.com/r/LumberInc/comments/1so91md/back_log_on_event/ r/LumberInc, ''Back log on event''], dated 17 April 2026 thread, one player's proposed Larry/storage explanation; not controlled or verified for every event version.</ref> || This does not show that all early-event worker stalls are intentional, or that purchasing a forest plot or changing a machine fixes them
|-
| '''Logs are being collected but workers appear frozen''' || Owner's separate Green Island firsthand report of ongoing collection during the stall, followed by resumption after Canting Machine 1 was upgraded from level 2 to level 3 || The April backlog account alone does not explain this observed level-2→3 resumption; ordinary order/warehouse formulas cannot be imported from the permanent 2026 factory
|-
| '''Machines/transport stall but lumberjacks continue chopping''' || A downstream input, output or storage buffer may be full; inspect the exact machine and transport path || It does not establish a secret worker-restart threshold or that every manager has become locked
|}
The April discussion documents '''another player's suggested storage behavior''', not a published developer rule. Do not advise turning Larry off as a universal cure: the player specifically described log backlog arising when the truck is disabled.
== Repeated event test needed to identify the real trigger ==
To distinguish competing explanations, record one continuous video from '''before''' the freeze until '''after''' a successful resumption and note the exact current event timer. Conduct separate future event runs for these cases:
{| class="wikitable"
! Test case !! Variable changed !! What would support or weaken the hypothesis
|-
| A: repeat Canting Machine 1 '''level 2→3''' || Only that transition, without changing mission, forest plot or log-truck setting || A repeated immediate restart would strengthen the narrow trigger hypothesis, but concurrent mission completion still needs exclusion
|-
| B: upgrade a different machine one level || Machine upgrade with no Canting Machine 1 2→3 || If it reliably restarts the same stall type, that weakens the claim that Canting Machine 1 specifically is required
|-
| C: upgrade Canting Machine 1 at '''another level''' || Same machine, different transition || If that also restarts, the triggering condition may not be limited to level 2→3
|-
| D: no machine upgrade during an equivalent stalled interval || Observe, record inventory/mission progress and worker counters without changing them || If workers spontaneously restart, time/quest processing is a confound
|-
| E: unchanged levels, different transport backlog || Observe forest buffer and Larry settings without spending on plot/machine || If log-collection state tracks storage saturation, it favors a transport-capacity explanation for that separate stall type
|}
A single player's observed restart is valuable evidence for choosing these tests, but '''none of A–E has yet been repeated under controlled same-build conditions'''. Do not spend real money or alter the device clock to force a test.


== What remains unverified ==
== What remains unverified ==

Latest revision as of 10:37, 26 November 2026

At the start of certain temporary sawmill events, lumberjacks or other workers can seem to pause even though logs or resources are available. A useful troubleshooting guide should distinguish an ordinary bottleneck from a game state that changes after a specific upgrade. Do not assume that restarting the app or purchasing another forest plot is the universal solution.

A documented player observation

During a reported Green Island event session, workers initially appeared stalled while log collection was still occurring. A player reported that upgrading Canting Machine 1 from level 2 to level 3 coincided with workers resuming normal activity. That is a firsthand, single-session observation, not proof that this particular machine upgrade is always required.

Three situations that look alike but may have different causes

What the player actually sees Evidence that fits Evidence that does not follow
Lumberjacks stop chopping and a log pile is full A 17 April 2026 community event discussion reports that disabling Larry's raw-log truck can allow the local forest buffer to fill, after which cutting stops; one respondent reported a threshold of 25 logs.[1] This does not show that all early-event worker stalls are intentional, or that purchasing a forest plot or changing a machine fixes them
Logs are being collected but workers appear frozen Owner's separate Green Island firsthand report of ongoing collection during the stall, followed by resumption after Canting Machine 1 was upgraded from level 2 to level 3 The April backlog account alone does not explain this observed level-2→3 resumption; ordinary order/warehouse formulas cannot be imported from the permanent 2026 factory
Machines/transport stall but lumberjacks continue chopping A downstream input, output or storage buffer may be full; inspect the exact machine and transport path It does not establish a secret worker-restart threshold or that every manager has become locked

The April discussion documents another player's suggested storage behavior, not a published developer rule. Do not advise turning Larry off as a universal cure: the player specifically described log backlog arising when the truck is disabled.

Repeated event test needed to identify the real trigger

To distinguish competing explanations, record one continuous video from before the freeze until after a successful resumption and note the exact current event timer. Conduct separate future event runs for these cases:

Test case Variable changed What would support or weaken the hypothesis
A: repeat Canting Machine 1 level 2→3 Only that transition, without changing mission, forest plot or log-truck setting A repeated immediate restart would strengthen the narrow trigger hypothesis, but concurrent mission completion still needs exclusion
B: upgrade a different machine one level Machine upgrade with no Canting Machine 1 2→3 If it reliably restarts the same stall type, that weakens the claim that Canting Machine 1 specifically is required
C: upgrade Canting Machine 1 at another level Same machine, different transition If that also restarts, the triggering condition may not be limited to level 2→3
D: no machine upgrade during an equivalent stalled interval Observe, record inventory/mission progress and worker counters without changing them If workers spontaneously restart, time/quest processing is a confound
E: unchanged levels, different transport backlog Observe forest buffer and Larry settings without spending on plot/machine If log-collection state tracks storage saturation, it favors a transport-capacity explanation for that separate stall type

A single player's observed restart is valuable evidence for choosing these tests, but none of A–E has yet been repeated under controlled same-build conditions. Do not spend real money or alter the device clock to force a test.

What remains unverified

Several possible explanations remain open: the trigger could be any machine upgrade, any threshold level, a specific Canting Machine 1 transition, an event mission state, or unrelated game-state timing. The available report cannot distinguish these alternatives. There is no verified secret universal percentage or cash threshold to publish.

A separate known event log-truck issue

AppQuantum's official Known Issues log (last updated 10 November 2026) says only three event log trucks are currently available and warns that a paid fourth truck may not appear. Its published advice is to avoid purchasing that fourth event truck until fixed.[2] This is specific to an event log-truck purchase/display problem; it does not establish the cause or trigger for idle lumberjacks, and it does not invalidate the separate Canting Machine 1 level 2→3 firsthand observation. When investigating a stall, record the number of trucks visible and how many were purchased, but do not automatically buy or upgrade anything to test a hypothetical trigger.

A repeatable test plan

  1. Record the event name, iOS/Android platform, game version and time since the event began.
  2. Note whether workers are truly inactive or whether log collection happens but delivery is blocked.
  3. Record the forest-plot count and exact machine levels, especially Canting Machine 1.
  4. Make one upgrade at a time. Observe the workers before and after each upgrade under the same conditions.
  5. Test whether upgrading a different machine or a different level causes the same result in another new event session.
  6. Preserve a recording if possible so the sequence is visible without relying on memory.

Checks that do not destroy progress

Inspect full buffers, available logs, automation indicators and whether a machine is waiting on input or transport. Closing and reopening the app can be a benign check, but a restart that did nothing in one report should not be presented as a confirmed cure. Avoid reinstalling or clearing saved data just to troubleshoot an event stall.

Why event scope matters

The temporary event sawmill is isolated from the permanent factory. AppQuantum describes temporary events as having their own progress, managers and reset rules.[3] A trigger seen in Green Island may not appear in a Roaring '20s special event or the current permanent sawmill.

Report a reproducible trigger

If you reproduce the pause, include the exact upgrade that resumed activity, and also record any unsuccessful upgrades beforehand. Negative results are important for identifying the real condition.

References

  1. ↑ r/LumberInc, Back log on event, dated 17 April 2026 thread, one player's proposed Larry/storage explanation; not controlled or verified for every event version.
  2. ↑ AppQuantum Support, Known Issues, publisher issue log dated 10 November 2026; checked 26 November 2026.
  3. ↑ AppQuantum, Temporary Events Guide, publisher information reviewed November 2026.