Parallel Orders: Difference between revisions
Player 0001 (talk | contribs) New cited wiki guide for the comprehensive site build |
Player 0001 (talk | contribs) Add page-specific report correction form without permitting reader edits |
||
| Line 24: | Line 24: | ||
[[Category:Orders]] | [[Category:Orders]] | ||
[[Category:2026 Main Sawmill]] | [[Category:2026 Main Sawmill]] | ||
{{Report a Correction}} | |||
Latest revision as of 04:19, 26 November 2026
The permanent main-sawmill order system changed with the 2026 production overhaul. AppQuantum describes parallel orders and product-specific warehouse sections rather than assuming every customer order draws from the same general stockpile.[1]
Why parallel orders matter
If the order screen can show work for separate production lines, an outstanding contract may require a particular line's product. Spare stock on another line is not necessarily interchangeable. A strategy optimized for one old order slot can be misleading on a newer permanent-factory build.
Unlock requirements
The publisher's iOS version history describes the parallel-order capability being available after progression to the third sawmill, but the precise visibility and unlock across all account cohorts should be checked in-game.[2] Do not tell a new player who cannot see the extra slots that their account is broken.
Product-specific warehouse storage
The current publisher guide identifies line-specific storage sections. When troubleshooting, determine which line is full or empty. The incoming material, product and order constraints can differ among the lines, even if the total factory income displays only one summary.[1]
Orders larger than stock
AppQuantum's FAQ says offered contract quantities derive from production/processing information rather than strictly from the stock currently sitting in inventory. Orders can therefore request more material than is on hand and may be fulfilled as additional products are made; the publisher says the order need not expire on a simple countdown.[3]
Efficiency trade-offs
A very large order may tie up one line for a long period, while another slot continues to offer useful rewards. Compare the cash or Biz Points payout with the materials, time, opportunity cost and current bottleneck. A contract is not automatically efficient merely because its numerical payout is large.
Do not mix events with permanent orders
Green Island and other temporary sawmills may use different layouts, managers and reward logic. Publisher materials about the post-February-2026 permanent-sawmill parallel system do not establish an identical setup in events. See Order Size and Inventory, Warehouse Storage and Bottlenecks and Temporary Events.
Sources and further reading
- ↑ 1.0 1.1 AppQuantum, Parallel Order System (publisher guidance, reviewed November 2026).
- ↑ Apple App Store, official Lumber Inc. version history (February–May 2026 overhaul notes).
- ↑ AppQuantum, Order Quantities.
Report a correction on this page · Questions? Email the wiki editor.