Warehouse Storage and Bottlenecks: Difference between revisions
Player 0001 (talk | contribs) New cited wiki guide for the comprehensive site build |
Player 0001 (talk | contribs) Add page-specific report correction form without permitting reader edits |
||
| Line 32: | Line 32: | ||
[[Category:Logistics]] | [[Category:Logistics]] | ||
[[Category:2026 Main Sawmill]] | [[Category:2026 Main Sawmill]] | ||
{{Report a Correction}} | |||
Revision as of 04:19, 26 November 2026
An idle machine or slow order may be caused by limited storage rather than lack of worker upgrades. The publisher's newer permanent-sawmill documentation identifies separated warehouse sections for production lines, which requires a more specific diagnosis than factory storage is full.[1][2]
Start at the blocked contract
Record which product the order requests and which warehouse section holds it. An oversized contract may exceed the current stock and still be fillable over time. The publisher describes offered quantity as related to productivity, not limited to the inventory visible at offer time.[3]
Work backward through the line
If the needed warehouse section is empty, inspect that line's last machine, its manager and its input supply. If the section is completely full, the line may stop producing until materials move out. A forklift waiting at a full destination may be behaving normally rather than suffering a software bug.
Common bottleneck categories
| Observation | Possible limiting area | Next check |
|---|---|---|
| No raw logs delivered | Forest growth, workers, truck flow | Watch forest and incoming log stock |
| Logs present but processing stopped | Manager/automation or machine input/output | Read machine panel and adjacent buffer |
| Product made but target stock missing | Warehouse segmentation, forklift or line routing | Verify exact product and storage section |
| Warehouse stocked but order stalled | Contract state or automatic delivery | Compare requested and delivered quantities |
These are diagnostic possibilities, not confirmed explanations for every account.
Capacity versus speed
A capacity upgrade helps only when the warehouse is constraining throughput. A speed upgrade helps only when its machine or vehicle is the bottleneck. Measure the time to complete several equivalent orders before and after one controlled change; avoid comparing a sale-boosted session to a normal one.
Event and older-version caution
The 2026 permanent factory's segmented storage cannot be assumed present in temporary events, and historical single-line videos may show a legitimately different system. See Glass and Product Materials, Forklifts and Log Trucks and Production and Machinery.
Sources and further reading
- ↑ AppQuantum, Parallel Order System (reviewed November 2026).
- ↑ AppQuantum, Machines and Materials.
- ↑ AppQuantum, Order Quantity.
Report a correction on this page · Questions? Email the wiki editor.