Jump to content

Orders and Sales: Difference between revisions

From Idle Lumber Empire Wiki
Independent cited wiki research article and system guide; 2026 build
 
Add page-specific report correction form without permitting reader edits
Line 26: Line 26:


[[Category:Orders and Sales]]
[[Category:Orders and Sales]]
{{Report a Correction}}

Revision as of 04:18, 26 November 2026

Orders connect the sawmill's processed timber with rewards. A profitable production line is useful only if its output can reach a buyer or fulfill another needed purpose. The main order board, Workshop construction and special contracts are related but distinct systems.[1]

Ordinary sawmill orders

Before accepting an order, compare its requested material with the products currently available in your warehouse. Do not assume the board is always offering something compatible with a recently upgraded production layout. Orders that require an older material may be difficult to complete if a new machine is now consuming that material before it reaches storage.[2]

Look at the actual reward types, not only the largest displayed number. Cash can help the immediate factory; Biz Points and other rewards may support quite different systems. Choosing an order is therefore a resource decision as well as a way to clear the warehouse.

Workshop orders are construction projects

The Workshop uses lumber-related materials and construction supplies in building projects. Its completion state and rewards are not the same as simply sending a standard sawmill shipment. The publisher's mission guidance makes clear that completing the full relevant construction process is what counts for some Workshop requirements.[3] See Workshop and Blueprints.

Express orders and reward presentation

Special or time-limited Workshop contracts may offer different reward types or conditions. The publisher has a separate help article for confusion over the final Express Workshop rewards, including distinctions between a displayed multiplier and the amount shown when a contract completes.[4] Do not promise that every current express contract will double every currency unless the exact reward display and game version support that reading.

Improving your order workflow

  1. Check that the sawmill is producing the correct material for the order you want.
  2. Keep an eye on storage capacity and forklift activity while the order is pending.
  3. Consider whether the offered rewards address your present progression need.
  4. For Workshop projects, ensure all required materials are delivered and the complete project has reached its finish state.
  5. When comparing sale-manager bonuses, verify the individual manager's role and current level rather than applying an old generic bonus table.

Common misunderstandings

A temporarily empty warehouse is not necessarily a production failure; output might be flowing into another machine. A completed ordinary shipping contract may not count as a completed Workshop construction task. Temporary event orders and main factory orders need separate observations, because event inventories and manager progression do not transfer into the permanent game.[5]

Sources

  1. ↑ AppQuantum: How Do I Play Lumber Inc? (publisher overview, reviewed 25 November 2026).
  2. ↑ AppQuantum: Why the Forklift Stops Delivering Lower-Tier Materials to Storage (publisher troubleshooting article, reviewed 25 November 2026).
  3. ↑ AppQuantum: Why Aren't My Workshop Orders Counted in the Mission? (reviewed 25 November 2026).
  4. ↑ AppQuantum: Why Didn't I Get the Rewards After Completing the Express Workshop Order? (reviewed 25 November 2026).
  5. ↑ AppQuantum: Temporary Events Guide (reviewed 25 November 2026).