2026 Permanent Factory Overhaul
2026 Permanent Factory Overhaul
The modern permanent sawmill does not necessarily operate like older Lumber Inc. guides. AppQuantum's parallel-order documentation describes production-line-specific warehouse sections and multiple targeted orders, rather than an older single undifferentiated product warehouse.[1]
What changed in the published description
| Area | Older descriptions may suggest | 2026 publisher documentation describes |
|---|---|---|
| Product inventory | One main finished-material warehouse | Separate sections aligned with production lines |
| Order selection | One order effectively occupies shared stock | Targeted parallel orders with line-specific stock and speeds |
| Production line effects | A single downstream slow machine limits everything | More independent production-line behavior |
| Advanced materials | Mainly cants and wood planks in older tutorials | Additional materials and processing opportunities in upgraded factories |
This is a source-based comparison, not a controlled reconstruction of every pre-2026 release.
Why old advice fails
A player may have a full lower-tier stockpile while the order board needs an advanced product from another warehouse section. Restarting a forklift or endlessly upgrading an unrelated machine may not fix that order. Read the exact requested product and inventory section before assuming all stock is interchangeable.
Machine unlocks still matter
AppQuantum's machine guide ties new equipment to earlier line construction, the preceding machine's Income Level 25 and sawmill-tier requirements.[2] Those requirements relate to permanent sawmill progression, not necessarily a temporary event.
Event content is a separate research track
Green Island, Cold Snap, Roaring '20s and other events can retain different machine or order logic and reset after a limited duration. Applying a permanent-factory warehouse explanation to an event without checking the event could mislead readers.
How to read dated screenshots
Capture the platform, approximate app version, date, machine names, warehouse sections and order board layout. If an older screenshot shows only one warehouse, it may be historically accurate but no longer generalize to the modern permanent game.
What is not a verified conclusion
The official guides do not provide a universal exact per-stage upgrade percentage, advanced-material multiplier, all-sawmill unlock cost or every account's order processing rate. The wiki does not substitute theoretical numbers for measured data.
Sources
- ↑ AppQuantum, Parallel Order System, publisher article reviewed November 2026.
- ↑ AppQuantum, New Machine Requirements, publisher FAQ.
Report a correction on this page · Questions? Email the wiki editor.