Strategy: parallel orders and production bottlenecks
Applies to
AppQuantum's permanent-factory Parallel Order System describes dedicated warehouse sections for separate production lines and several simultaneous, targeted orders.[1] Older single-inventory guides do not transfer directly.
Bottleneck checklist
- If Statistics is available in your installed version, check machine speeds and line efficiency; these measurements are described in the publisher's FAQ.[2]
- Look for a warehouse section that is constantly empty while downstream orders wait: check source production and transport.
- Look for a section constantly full while the source line stops: check order demand, delivery timing and stock removal.
- If the source materials are short, upgrading downstream speed may be ineffective.
- If the order queue is full, prioritize delivering stock before buying more upstream capacity.
- Compare manager upgrades, machine upgrades and order-selection changes by throughput improvement and cost.
Three-lane planning
The newer game describes standard lumber, engineered products and structural columns. For each line record product/minute, warehouse fill fraction, actual sale rate, stockout minutes and upgrade cost. A single faster machine is not the same as a faster factory.
Measurement framework
A useful reader measurement is: incremental delivered units per minute = (delivered units in a 10-minute comparison after the change − delivered units in a matching 10-minute comparison before the change) / 10. The 10-minute duration is an example chosen for testing, not a publisher-mandated interval or a promised per-stage bonus. Keep boosts, orders, manager levels, online state and line inventory comparable, and repeat trials if random order types distort the result. A faster queue may matter more than a machine income multiplier if fulfilled orders are the limiting factor.
- ↑ AppQuantum, What Is the Parallel Order System?, checked 26 November 2026. Publisher guidance; do not transpose to regular or special temporary events without testing.
- ↑ AppQuantum, Where Is the Statistics Icon and What Is It For?, checked 26 November 2026. A below-90% interpretation is publisher guidance, not an independently established universal threshold.
References and evidence
Use the Statistics screen before upgrading
See Strategy: Find the real production bottleneck. Measure whether the limit is log supply, machine processing, warehouse space, or transport before buying more capacity in any one area.
Source provenance: recovered verbatim research from the original Version 29 archive (17 November 2026), with obsolete category links mapped to the current topic directory. Current gameplay facts are governed by the evidence note above.
Report a correction on this page · Questions? Email the wiki editor.