Strategy: parallel orders and production bottlenecks
Applies to
The publisher's updated parallel-order system with independent warehouse sections for different production paths. Older single-inventory guides do not transfer directly.
Bottleneck checklist
- Check the in-game Statistics screen for actual machine speeds, line efficiency and storage limitations.
- Look for a warehouse section that is constantly empty while downstream orders wait: check source production and transport.
- Look for a section constantly full while the source line stops: check order demand, delivery timing and stock removal.
- If the source materials are short, upgrading downstream speed may be ineffective.
- If the order queue is full, prioritize delivering stock before buying more upstream capacity.
- Compare manager upgrades, machine upgrades and order-selection changes by throughput improvement and cost.
Three-lane planning
The newer game describes standard lumber, engineered products and structural columns. For each line record product/minute, warehouse fill fraction, actual sale rate, stockout minutes and upgrade cost. A single faster machine is not the same as a faster factory.
Measurement framework
Incremental throughput = (units delivered in 10 minutes after change − units delivered in 10 minutes before change)/10. Record 10-minute comparison under similar boosts, warehouse fill and online state. A faster queue may be a better upgrade than a machine income multiplier.
References and evidence
Use the Statistics screen before upgrading
See Strategy: Find the real production bottleneck. Measure whether the limit is log supply, machine processing, warehouse space, or transport before buying more capacity in any one area.
Source provenance: recovered verbatim research from the original Version 29 archive (17 November 2026), with obsolete category links mapped to the current topic directory. Current gameplay facts are governed by the evidence note above.