Production lines, machines and materials

From Idle Lumber Empire Wiki
Revision as of 09:00, 26 November 2026 by Player 0001 (talk | contribs) (Publisher-qualified three permanent manufacturing lines, retired-order matching and segregated storage)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Research status: Publisher describes three lines; exact machine inputs, speeds and upgrade costs untested. Verify against the current game version before treating gameplay figures as established facts.

AppQuantum's 2026 guide describes debarkers followed by three product lines:

Line Publisher-listed machines Material examples
Standard lumber Canting → Resaw → Sanding Cants, rough lumber, sanded lumber
Engineered panels Wood Chipper → Pressing → Cutting Chip bags, chipboard, frames
Structural pillars Turning → Grinding → Painting Rough/finished/painted columns

Unresolved input: The publisher calls Resaw's input cants and output rough lumber, but also describes Sanding as refining cants. We must check whether Sanding consumes rough lumber or cants, rather than assume a single linear material chain.

2026 store notes mention new machines and products, glass as construction material, segmented packing sections and parallel orders. The precise machines available to players differ by factory tier and version; test before filling costs.

Published input/output details by machine

AppQuantum's full machine FAQ supplies these more specific product transformations in the modern permanent factory:[1]

Line or shared stage Machine Input → output described by publisher
Shared inlet Debarker Raw logs → peeled logs
1 Standard wood Canting Peeled logs → cants
1 Standard wood Resaw Cants → rough lumber
1 Standard wood Sanding The FAQ says cants → smooth lumber; the relationship to rough lumber is not clarified
2 Engineered/panels Wood Chipper Peeled logs → chip bags
2 Engineered/panels Pressing Chip bags → chipboards
2 Engineered/panels Cutting Chipboards → construction frames
3 Structural/pillars Turning Peeled logs → rough columns
3 Structural/pillars Grinding Rough columns → finished columns
3 Structural/pillars Painting Finished columns → painted columns

Do not invent a Sanding input: the publisher oddly writes that both Resaw and Sanding work on cants. We have not established whether this describes a branch, a documentation typo or a version-specific factory routing change. Check an actual current factory UI and game version before finalizing a strictly linear Resaw-to-Sanding diagram.

The two gates beyond owning enough cash

AppQuantum's machine construction FAQ says a future machine usually depends on previous machines in that line being built, the preceding machine reaching Income Level 25, and the permanent sawmill being advanced enough to offer the machine.[2] These are publisher-documented conditions, not a controlled requirement table for every machine or a special-event unlock trigger.

Why the warehouse and orders can appear inconsistent

The line-specific package area opens its section when a machine on the line is placed.[3] Intermediate products such as cants can also stop being delivered to storage when a downstream processor begins consuming them.[4] That means a material being made somewhere on the floor is not equivalent to its being available to fulfill an old order. See Orders stuck after machine changes. Do not transpose these modern permanent-sawmill warehouse rules to a Green Island, Cold Snap or Roaring '20s event.

Sources

  1. ↑ AppQuantum, All Machines and Materials Description, publisher Help Center checked 26 November 2026. These are publisher descriptions, not independently measured stage statistics.
  2. ↑ AppQuantum, How to Build a New Machine, publisher help checked 26 November 2026; source-specific permanent factory, not event automation or manager-card caps.
  3. ↑ AppQuantum, New Package Area System, checked 26 November 2026.
  4. ↑ AppQuantum, Why the Forklift Stops Delivering Lower-Tier Materials to Storage, checked 26 November 2026.

Why available finished stock may not ship

Use Statistics dashboard: reading production efficiency to test which machine or logistics segment actually constrains production.

Machine construction gates

AppQuantum says main-mill machine construction can require preceding production-line machines, Income Level 25 on the preceding machine and a sufficiently advanced permanent sawmill. Unlocking machines: income level and production order explains the diagnostic sequence. Evolution is a separate manager-level-gated action.

Source provenance: recovered verbatim research from the original Version 29 archive (17 November 2026), with obsolete category links mapped to the current topic directory. Current gameplay facts are governed by the evidence note above.